Painted Pebblecrete Resurfacing Pool Renovation in Whale Beach

Complex Renovation Involving Skimmer Box Relocation and Fibreglass Resurfacing

The Painted Pebblecrete Pool Renovation in Whale Beach took 2.5 weeks to complete. Initially, the pool was raised due to the installation of new coping, which caused issues with the existing skimmer box. As a result, the skimmer box became nonfunctional. Therefore, we collaborated with a pool specialist to resolve this issue. This collaboration delayed the renovation slightly, but it was essential for ensuring proper pool functionality.

Afterward, we began by relocating the skimmer box to a more efficient position. The skimmer box now works effectively, allowing the pool’s filtration system to function correctly. Once the skimmer box was relocated, we resumed the resurfacing work without any further delays. We ensured the surface was adequately prepared for the fibreglass application.

Throughout the Painted Pebblecrete Pool Renovation, we focused on precision and high-quality results. We drained the pool and removed the hydrostatic valve. Then, we carefully inspected the surface and repaired damaged areas to make sure it was ready for the fibreglass interior. Following that, we applied a primer coat to create a strong foundation for the fibreglass laminate.

Next, we installed the fibreglass laminate, which reinforced the structure and ensured long-lasting durability. After applying the bulk resin coat, we added the filler coat and the final topcoat, giving the pool a fresh and beautiful appearance. Moreover, we added a non-slip surface to the step treads, enhancing safety and functionality.

Finally, we replaced the hydrostatic valve to complete the renovation process. The Painted Pebblecrete Pool Renovation at Whale Beach restored both the aesthetics and functionality of the pool. Despite the initial delays, the project was successfully completed within the expected timeframe, and the results exceeded expectations.

The Painted Pebblecrete Pool Renovation transformed the pool into a beautiful and fully functional space, ready for use.

service image project images after
service image service image

About Project

This Painted Pebblecrete Resurfacing Pool Renovation at Whale Beach was more complex due to the raised pool caused by the new coping installation. The skimmer box, positioned incorrectly after the coping work, was no longer functional. We worked closely with a pool specialist to relocate the skimmer box, ensuring the pool’s filtration system would operate efficiently. Though this added time to the overall process, it was necessary for the pool’s long-term functionality. After the skimmer box was fixed, we drained the pool and prepared the pebblecrete surface for the new fibreglass lining. The resurfacing was completed within 2.5 weeks, restoring the pool's aesthetic appeal and functionality.

For this resurfacing project, we followed the following process:

  1. Drain the Pool.
  2. Remove the hydrostatic valve.
  3. Remove damaged/"drummy" areas to existing surfaces (up to 2sqm).
  4. Prepare pool surface to accommodate new fibreglass interior.
  5. Cut out and treat rust.
  6. Apply a Primer Coat.
  7. Apply Reinforcing Material (Fibreglass Laminate).
  8. Apply Bulk Resin Coat over Fibreglass Laminate.
  9. Apply Filler Coat (undercoat).
  10. Apply Final Topcoat (colour of your choice).
  11. Apply a non-slip surface to step treads.
  12. Replace hydrostatic valve.

Testimonials

Does Your Pool Need Resurfacing?

Person Image Pool Image